Maintenance after grouting construction
Sep 13, 2018

1. Within 30 minutes after the completion of grouting, immediately spray the curing agent or cover the plastic film and cover the rock wool quilt for curing, or immediately after the final filling of the grouting layer, watering and moisturizing.

2. During winter construction, the maintenance measures should also comply with the relevant provisions of the current "Code for Construction and Acceptance of Reinforced Concrete Projects" GB50204.

3. Observe the curing time and demoulding schedule under different temperature conditions.

Through the above, the curing agent should be sprayed immediately or covered with a plastic film and covered with rock wool quilts for maintenance, or immediately after the final filling of the grout layer, watering and moisturizing.