Search

Home > News > Content
Polymer Repair Mortar Related Knowledge
Sep 13, 2018

Matters needing attention: The construction quality should be strictly controlled during construction. It is not necessary to add other types of plasticizers and other materials outside the specification; after the completion of construction, moisturizing and curing should be strengthened; when the temperature is lower than 5 °C for 5 consecutive days, insulation measures should be adopted for winter construction. .

Packing, storage and transportation: use moisture-proof packaging, net weight is 25kg/bag; should be stored in dry and ventilated place to avoid moisture; this product is non-toxic, non-combustible product, can be transported as non-dangerous goods; From the beginning, the shelf life is 6 months, and it can be used only after the re-inspection of the expiration date.


  • Previous: No Information
  • Next: No Information

Related News

Copyright © Zhejiang Taizheng Construction Material Co.,Ltd All Rights Reserved.